  Welcome to Wind Capital Group  
 
Magnification Click picture for Larger Version
Loess Hills (Rock Port, Missouri)

Loess Hills Wind Farm is a 5 MW project adding a renewable power source to the Rock Port, Missouri municipal utility system. Built on agricultural lands within the city limits of Rock Port, four Suzlon 1.25 MW turbines connect directly to the city's high voltage line. Homes and businesses getting power from Rock Port's Municipal Utility will use wind energy, backed by other supply from the Missouri Joint Municipal Utility system. The Loess Hills Wind Farm will produce enough electricity to make Rock Port, Missouri the first community in America capable of meeting its entire annual electricity demands from wind power.

 

 
   
Bluegrass Ridge Image
Magnification Click picture for Larger Version
BLUEGRASS RIDGE (Gentry County, Missouri)

Construction on Bluegrass Ridge began in June of 2006. The wind farm erected 27 S88 turbines. Each of the turbines in Gentry County has a nameplate capacity of 2.1 megawatts (MW) for a total project size of 56.7 MWs. Bluegrass Ridge is projected to provide enough "green energy" to power about 34,000 homes. Proudly 6.3 MWs of energy has been sold to the city of Columbia, MO.

 

   
 
Cow Branch Image
Magnification Click picture for Larger Version
 

COW BRANCH WIND ENERGY CENTER
(Atchison County, Missouri)

Construction on the Cow Branch Wind Energy Center began in 2007 in Atchison County, Missouri. The wind farm will consist of 24 Suzlon S88s, each with a nameplate capacity of 2.1 MW, for a total project size of 50.4 MWs. Cow Branch is expected to provide enough clean, renewable energy for 30,000 homes.

   


 
     
Conception Wind Farm Image
Magnification Click picture for Larger Version
 

CONCEPTION WIND FARM
(Nodaway County, Missouri)

Conception Wind Farm in Southwest Nodaway County, Missouri is currently receiving blades and nacelle deliveries. Foundations are completed, and town erection will begin shortly. This 50 MW wind project should go on line by the end of 2007.
     


 
 

FUTURE PROJECTS:

Wind Capital Group’s presence in the wind energy industry is growing rapidly. Currently, Wind Capital Group is working on development of future projects totaling more than 1400 MW in ten states.


 
 